As a professional gas fired boilers supplier, Zhongzheng Boiler has customized a gas superheated steam condensing boiler with a rated evaporation capacity of 50t/h for the new energy industry, and the professional and considerate service during the installation was favored by customers. As the supplier of gas fired boilers for this new energy project, the technical guidance staff of Zhongzheng Boiler overcame the impact of the epidemic and arrived at the project site to ensure the boiler installation process.
It is understood that the ZZ series of gas-fired superheated steam boilers provided by the boiler for its bulk factory, installation of large, complex construction process, long cycle, the installation unit according to the design drawings of the site prefabricated welding, welding required to be radiographic detection according to the pot gauge. In order to ensure that the expected effect of the design is achieved, Zhongzheng boiler technical personnel stationed at the site to guide the boiler installation, especially the construction sequence of the furnace wall, convection tube bundle area for the front of the column structure, the rear of the staggered column structure.
Under the guidance of the technicians of Zhongzheng Boiler and the joint efforts of the installation team, the gas boiler installation is progressing smoothly. Throughout the project construction for more than half a year, as a professional gas fired boilers supplier, Zhongzheng Boiler has always been fully cooperate with the new energy project work schedule, actively promote the progress of the project, and wholeheartedly complete the guidance of the boiler installation, water pressure test, auxiliary engine installation, pipeline installation and other work.
In the new energy project, Zhongzheng Boiler’s after-sales service is quick to respond, helping the company to speed up the construction progress and laying a foundation for the project to be put into operation, with professional technical support to ensure the safety and reliability of steam supply. In the future, Zhongzheng Boiler will continue to give full play to the advantages of boiler experts to provide personnel training, technical guidance and other work for the long-term stable operation of the boiler system to do a full cycle of after-sales service, to provide users with high-quality development.
At the beginning of 2020, the world has suffered the ravages of the new crown epidemic, and projects around the world have come to a standstill. Under the influence of the epidemic, along with a series of chain reaction occurred, industrial boiler industry is bound to be affected to a greater extent. In the face of such a grim situation, the boiler countervailing, all the way to the lead. According to statistics, from January to July this year, in the boiler sales compared to the same period last year, but also to achieve a slight increase.